Skip to main content
Hermes OS

Enterprise Industrial Intelligence Platform

Industrial Intelligence.
Engineered for Action.

Transform industrial evidence, engineering knowledge, and operational data into explainable decisions and safe action paths.

Illustrative product view — sample data, not live plant telemetry.

The industrial reality Hermes was built for

Plants generate more signals, documents and expert know-how than any team can hold together — and decisions still have to be safe.

  1. Site B · Pump P-204
  2. Industrial Data
  3. Evidence
  4. Industrial Brain
  5. Hypotheses · Risk
  6. Human Approval
  7. Safe Action Path
PLCSCADA/HMIOPC UAIllustrative product view — sample data, not live plant telemetry.

Site B · Pump P-204

Analyzing

  1. Evidence · Vibration RMS +18% / 14d

  2. Contradiction · Oil analysis clean

  3. Missing · Recent FFT spectrum

  4. Bearing inner-race wear

    Confidence HIGH · 0.86

  5. Risk · Medium

    Progressive failure ~3 weeks · redundant pump available

  6. Human Approval

    Human approval required

  7. Safe Action Path

Illustrative product view — sample data, not live plant telemetry.

Four pillars of industrial intelligence

Four assurance planes connected by one evidence-to-action spine.

Evidence-based

Input
Industrial data
Process
Evidence correlation and contradiction surfacing
Output
Evidence-bound report
Constraint
Missing evidence remains explicit

Explainable reasoning

Input
Weighed evidence
Process
Deterministic rules with labelled model inference
Output
Ranked hypotheses with confidence
Constraint
Every conclusion traces to its evidence

Model-assisted

Input
Ranked hypotheses
Process
Simulation and model-assisted estimation
Output
Risk assessment
Constraint
Model output is quarantined from observed fact

Safe action

Input
Risk assessment
Process
Validation gates and human approval
Output
Safe action path
Constraint
No plant state changes without explicit approval

The engineering foundation

One platform, five operating domains

  1. Operations

    • Instrumentation
    • Electrical
    • Asset
  2. Edge gateway & connectivity

    • PLC
    • OT Edge
    • OPC UA
    • MQTT
  3. Digital Twin & Time Series

    • SCADA/HMI
    • Historian
    • Time Series
  4. Knowledge Engine & Graph

    • Digital Twin
    • Knowledge Graph
    • EDMS
  5. Intelligence

    • Industrial Brain
    • Copilot
  • Edge gateway & connectivity

    Gateway and connector management with a protocol-aware architecture — OPC UA, MQTT, PLC and SCADA domains, designed for on-prem and edge deployments.

    Explore OT Edge
  • Digital Twin & Time Series

    Model asset hierarchies and tags, and analyze their time-series behavior on the same surface the Brain reasons over.

    Explore Digital Twin
  • Knowledge Engine & Graph

    Curated engineering libraries across PLC, SCADA/HMI, electrical, instrumentation, protocols, cybersecurity and maintenance — connected in a knowledge graph with real engineering cases.

    Open the Knowledge Library

The intelligence core

One evidence-bound reasoning core, with assistance kept outside the decision gate.

CORE

Industrial Brain

The diagnostic reasoning engine: it weighs evidence, ranks hypotheses with confidence, surfaces contradictions and missing data, and proposes a safe action path.

  • Evidence rail
  • Ranked hypotheses
  • Confidence & risk
  • Safe action path
Explore Industrial Brain

ASSISTANT

Engineering Copilot

A bilingual engineering assistant grounded in the platform's industrial knowledge — explainable answers, with a deterministic public demo.

  • Bilingual FA/EN
  • Grounded in platform knowledge
  • Explainable responses
Try the Copilot

Human-guided action, by design

No recommendation reaches plant equipment without passing validation gates and explicit human approval.

ProposedPending
Actor
Industrial Brain
Evidence requirement
Correlated evidence with contradictions surfaced
Blocking condition
Missing evidence not yet declared
ValidatedValidated
Actor
Validation rules
Evidence requirement
Confidence above threshold and traceable
Blocking condition
Unresolved contradiction
Human ApprovalDecision
Actor
Responsible engineer
Evidence requirement
Risk assessment and action rationale
Blocking condition
No explicit human approval
ExecutedReleased
Actor
Safe action path
Evidence requirement
Approval record and audit trail
Blocking condition
Released only after approval
  • Multi-tenant · site-level isolation
  • Organization & site RBAC
  • PLC · SCADA · OPC UA · MQTT
  • Deterministic + explainable

Learn, reference, publish

Industrial Journal

Industrial Journal

Community articles and engineering stories.

Articles and engineering write-ups from the Hermes community.

Deterministic + explainable

Read the Journal

Hermes Academy

Structured industrial courses and certificates for engineering teams.

Visit the Academy

Knowledge Library

Engineering knowledge libraries and real diagnostic cases, open to read.

Browse the Library